Original Factory Supplement Service Manual for the JCB LK1 Personnel Platform.
This manual is a supplement to the JCB Loadall Service Manual. The information covers JCB Loadall machines fitted with the LK1 Personnel Platform.
Machine Models and Serial Numbers:
This manual supplement provides information for the LK1 Work Platform, compatible with the following models in the JCB machine range:
3-Stage Boom Machines
– 532-120
– 535-125
– 535-140
– 537-135 (550)
– 540-140 (550-140)
4-Stage Boom Machines
– 540-170 (550-170, 5508)
Contents as Follows:
Introduction
General Information
Machine Model and Serial Number
About this Supplement
Safety Check List
System Overview
Introduction
Controls
Remote Servo Control
Emergency Operation
Motion Cut Out (MC) (if fitted)
Component Location and Identification
System Operation
Service Procedures
RCU Engine Start Procedure
Fault Finding
Introduction
Tables
Servicemaster Tools
Manplatform Diagnostics – User Guide
Introduction
Care and Safety
Installing Manplatform Diagnostics
Connecting Manplatform Diagnostics
Starting the Manplatform Diagnostics Software
Remote Control Unit Test
Internal Monitor
Error log
540 Valve (540-170 machine only)
Cabin Joystick
Remote Control
Stabilizer Joystick (3 Stage Only)
Connector I/O
Manplatform Calibration – User Guide
Introduction
Care and Safety
Installing Manplatform Calibration
Connecting Manplatform Calibration
Starting the Manplatform Calibration Software
Introduction
Manplatform Enable – Machines With Motion Cut Out (MCO)
Machine Model Setup
Load Signal
Stabilizer Joystick Setup (3-Stage Boom Machines)
Travel Speeds (Part 1)
Travel Speeds (Part 2)
Hydraulic Control Sensitivity
Electrics
Fuses and Relays
Quick Reference
Schematic Circuits
Machines with R-Series Engines
Machines with JCB Dieselmax Engines
Engine Start Operation – Cabin Mode
Engine Start Operation – Remote Mode
Stabilizer Legs Down
Park Brake ON
Emergency Isolation Switch
Receiver Signal Integrity
Remote Mode Select
Starter Motor Operation
Machine Operation – Remote Mode
Receiver Signal Integrity
Stabilizer and Sway Isolation
Boom Angle Limit (4 Stage Boom)
Engine Speed Actuator Operation
L.M.I. Operation
L.M.I. Operation (3 Stage Boom)
L.M.I. Operation (4 Stage Boom)
Control Valve Operation
Control Valve Operation (3 Stage Boom)
Control Valve Operation (4 Stage Boom)
Joystick Operation
Emergency Pump Operation
Harness Drawings
Introduction
Quick Reference
Chassis Harness
Panel Harness
Stabilizer Harness
Joystick
Removal and Replacement
LMI Transducers
Removal and Replacement
Electronic Control Unit (LK1 ECU)
Removal and Replacement
Electronic Control Unit (LK1 ECU) Battery
Removal and Replacement
Stabilizer Pressure Switches
Removal and Replacement
Proximity Switches
Locations
Radio Receiver
Removal and Replacement
Engine Speed Actuator
Removal and Replacement
Hydraulics
Technical Data
3-Stage Boom Machines
4-Stage Boom Machines
Schematic Circuits
3-Stage Boom Machines
4-Stage Boom Machines
Control Valve (3-Stage Boom Machines)
Operation
Control Valve Layout
Pressure Testing
Removal and Replacement
Dismantling and Assembly
Control Valve (4-Stage Boom Machines) .
Operation
Removal and Replacement
Dismantling and Assembly
Pilot Control Valves (4-Stage Boom Machines)
Locations
Removal and Replacement
Needle Valve (Slewing Platforms only)
Adjustment
Removal and Replacement
Non-Return Valves
Removal and Replacement
Tilt Ram – Counterbalance Valves
Removal and Replacement
Emergency Pump
Removal and Replacement
———————-
Model Specification: JCB LK1 Personnel Platform
Language: English
Total Pages: 208
File Format: PDF
Requirements: Adobe PDF Reader
Zoom In/Out: yes
Notes: Bookmarked, searchable, Fully printable, instant download
Compatible: All Versions of Windows & Mac, Linux OS, Iphone, Ipad, Smartphone, Android etc…
———————-
Pay Today and Download the complete manual instantly. The download link will also be sent to your e-mail. So please make sure your email address is correct. Don’t Forget to Check Spam / Junk if can’t find the new message in your email inbox immediately.
Thanks for Visiting.